{"id":28500,"date":"2020-01-13T06:42:02","date_gmt":"2020-01-13T06:42:02","guid":{"rendered":"http:\/\/abdas.org\/?p=28500"},"modified":"2020-01-13T06:42:02","modified_gmt":"2020-01-13T06:42:02","slug":"20yrs-ppa-secured-for-100mw-of-solar-pv-in-tunisia","status":"publish","type":"post","link":"https:\/\/abdas.org\/2020\/01\/13\/20yrs-ppa-secured-for-100mw-of-solar-pv-in-tunisia\/","title":{"rendered":"20yrs PPA Secured for 100MW of Solar PV in Tunisia"},"content":{"rendered":"<p><img loading=\"lazy\" src=\"http:\/\/abdas.org\/wp-content\/uploads\/2020\/01\/tunisia.jpg\" alt=\"\" width=\"750\" height=\"375\" class=\"alignnone size-full wp-image-28502\" srcset=\"https:\/\/abdas.org\/wp-content\/uploads\/2020\/01\/tunisia.jpg 750w, https:\/\/abdas.org\/wp-content\/uploads\/2020\/01\/tunisia-300x150.jpg 300w, https:\/\/abdas.org\/wp-content\/uploads\/2020\/01\/tunisia-150x75.jpg 150w, https:\/\/abdas.org\/wp-content\/uploads\/2020\/01\/tunisia-500x250.jpg 500w\" sizes=\"(max-width: 750px) 100vw, 750px\" \/>The consortium was assembled by TBEA Xinjiang New Energy Co., Ltd. and AMEA Power.<br \/>\nThis project was part of a large international tender launched by the Ministry of Industry and SMEs in Tunisia in 2018 and is aligned with the government\u2019s 2030 New Energy Vision.<br \/>\nUnder this international tender, a total capacity of 500MW solar projects was awarded to various fortunate bidders.<\/p>\n<p>After declaration, AMEA Power\u2019s Chairman, Hussain Al Nowais, said: \u201cWe are very delighted to close this year with the news of being awarded a large renewable energy project in one of our key target markets.<\/p>\n<p>&#8220;This is a project awarded through a competitive bidding process, and we look forward to supporting the country in accomplishing its objective to diversify the energy mix.&#8221;<\/p>\n<p>The 100MW solar project will be situated in Kairouan. A 20-year power purchase agreement (PPA) will be signed with the Soci\u00e9t\u00e9 Tunisienne de l\u2019Electricit\u00e9 et du Gaz (STEG).<\/p>\n<p>The power plant will be able to generate nearly 250,490GWh per year and will contribute to avoiding 247,000 metric tonnes of CO2 emissions each year.<\/p>\n<p>On 10 December 2019, AMEA Power signed a PPA with the Egyptian Electricity Transmission Company (EETC) for a 200MW solar PV project and a 500MW wind power project in Egypt.<\/p>\n<p>Prior to this, on 26 November 2019, AMEA Power signed a PPA with Togo\u2019s national utility company, La Compagnie Energie Electrique du Togo (CEET), for a 50MW solar PV project. This project is now under construction.<\/p>\n<p>Another PPA was inked earlier in 2019 with Chad\u2019s Ministry of Energy for a 60MW solar PV project. Moreover, the company has two projects under construction in Jordan; a 50MW solar power plant and a 51.75MW wind power plant.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The consortium was assembled by TBEA Xinjiang New Energy Co., Ltd. and AMEA Power. This project was part of a large international tender launched by the Ministry of Industry and &hellip; <\/p>\n","protected":false},"author":49501,"featured_media":28502,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[479],"tags":[],"aioseo_notices":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/posts\/28500"}],"collection":[{"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/users\/49501"}],"replies":[{"embeddable":true,"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/comments?post=28500"}],"version-history":[{"count":0,"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/posts\/28500\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/media\/28502"}],"wp:attachment":[{"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/media?parent=28500"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/categories?post=28500"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/abdas.org\/wp-json\/wp\/v2\/tags?post=28500"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}